From fire control to hydrant systems, we supply the pipes, fittings and components that make each system work — and ship them together.
Fire detection and control system components.
Grooved and threaded pipe connections for fire systems.
Seismic sway bracing components to stabilize fire piping.
Sprinkler heads and flexible connection assemblies.
Hydrant pipe and connection components.
Alarm and control valves for fire water systems.
ERW and seamless fire protection pipe.
A fire water system is not a list of parts. The seven areas above are the same loop, and the components are chosen so each one hands the load to the next.
The ERW and seamless fire protection pipe forms the mains and the branches. The pipe standard, size and end are set by the design, and the finish is matched to where the line will sit.
Malleable iron fittings close the threaded sections and the IF grooved couplings and fittings close the bolted ones. Each joint is sealed by its own standard, so the thread or groove form is matched end to end.
Hangers and clamps carry the weight and hold the line in level. The fire-rated items are rated to 343 degrees C (650 F), so the support holds while the pipe is doing its job in a fire event.
Alarm and control valves manage where the water goes, and the sprinkler and hydrant heads deliver it. Supply the pipe, joints and supports together and the system is spec-verified as one, not stitched from three vendors.
Representative products across the fire water system.



Fire pipe, sprinkler and seismic systems supplied across three continents.
Yes. We supply the pipe, the malleable iron and grooved fittings, the hangers and supports, and the system components, and ship them together as one package.
Product line: FM / UL / CE / LPCB / VDS. Partner factories: ISO / SGS / TUV. The specific mark applies to each product shown.
Yes, fire seismic bracing components are part of the range, to stabilize fire piping in seismic zones.
The one-stop angle in fire protection has mostly been taken by the gas suppression side. The water system is still assembled from separate vendors, pipe from one, fittings from another, supports from a third. This page is the supplier that takes the water side as one order and ships it that way.
Because the pipe, the malleable iron and grooved fittings and the hangers come from one line, the thread standard, the size range and the finish are checked against each other before anything ships. A system order should be verified as a system, and that is what this does.
The components leave the factory line and the warehouse in the northern logistics center as one package. When a size or a finish needs to change mid-order, there is one supplier to call, and the answer is not three invoices long.
Selection guides and field notes on fire protection pipe, fittings and supports.
“FM Approved” and “UL Listed” get used interchangeably on spec sheets. They are two different programs with two different purposes. Here is the real distinction.
Read →2026-09-23Two tapered thread systems, one very common mistake. Here is how to tell BSPT from NPT before it costs you a fitting.
Read →2026-09-23A practical selection path for malleable iron fire fittings, from the material story down to the finish you specify on the drawing.
Read →Send your bill of materials or drawing — we confirm spec, cert and lead time, then ship the full package.